QuantRead blog: real questions, straight answers

Each post answers one question people actually search for about take-offs, estimating and drawings. Written by the QuantRead team in plain trade language.

Guides

How do I do a take-off from PDF drawings?

A step-by-step method for a take-off from PDF construction drawings: check the scale, list items, measure, count, record your working, check on site.

13 November 2026 · 2 min read

Costs and pricing

How much does a quantity surveyor cost in the UK?

How UK quantity surveyors charge: percentage of build cost, day rate, hourly or fixed fee, with sourced November 2026 figures.

13 November 2026 · 2 min read

AI and software

Can AI read construction drawings?

Yes, AI can read construction drawings well enough for a first-pass take-off. Where it is strong, where it struggles, and how to check it.

13 November 2026 · 2 min read

Trade guides

How do you measure mastic and sealant from drawings?

Measure sealant from elevations: window and door perimeters, movement and panel joints in metres, then convert metres to cartridges by joint size.

13 November 2026 · 2 min read

Guides

What is a bill of quantities?

A bill of quantities (BoQ) lists every item of work with its quantity, measured to a standard such as NRM2, so contractors price the same thing.

13 November 2026 · 2 min read

Costs and pricing

How do you price a job from architect’s drawings?

How to price a building job from architect’s drawings: take off quantities, apply labour and material rates, add prelims, risk and margin.

13 November 2026 · 2 min read

AI and software

Is AI take-off as accurate as a manual take-off?

AI take-off vs manual take-off: what our own tests found, where AI matches a manual measure, where it differs, and how to use it so accuracy does not suffer.

13 November 2026 · 2 min read

AI and software

What software do quantity surveyors use?

The software UK quantity surveyors use: Excel, PDF measuring tools such as Bluebeam, take-off software such as CostX and PlanSwift, and AI tools.

13 November 2026 · 2 min read

Guides

How do you scale a PDF drawing to measure it?

How to scale a PDF construction drawing: read the title block, allow for paper size, calibrate on a written dimension and check it.

13 November 2026 · 2 min read

Trade guides

How many bricks do I need? Working it out from drawings

Work out bricks from drawings: measure net wall area less openings, then use about 60 bricks per m² (half-brick wall) or 10 blocks per m².

13 November 2026 · 2 min read

Guides

What is a quantity take-off in construction?

A quantity take-off is the list of quantities measured from drawings, in m, m² and nr, that estimates, bills of quantities and orders are built from.

13 November 2026 · 2 min read

Trade guides

How much plasterboard do I need from the drawings?

Calculate plasterboard from drawings: wall and ceiling areas less openings, times faces and layers, divided by 2.88 m² for a 2,400 × 1,200 mm board.

13 November 2026 · 2 min read

Trade guides

How do you work out a roof area from plans?

Work out roof area from plans: divide the plan area by the cosine of the pitch to get the slope area. Plus ridges, hips, valleys, eaves and verges.

13 November 2026 · 2 min read

Guides

How do you read construction drawings?

How to read construction drawings: the title block, scale, plans, elevations, sections, symbols, dimensions and revisions, in plain English.

14 November 2026 · 2 min read

Guides

What is the difference between a PQS and a contractor QS?

A PQS works for the client on cost plans and value; a contractor QS works for the builder on buying, valuations and margin. What each does and when.

14 November 2026 · 2 min read

Guides

What does a clerk of works do?

A clerk of works inspects construction for the client, checking materials and workmanship against the drawings and specification. What the role involves.

14 November 2026 · 2 min read

Guides

How do you check construction work against the drawings?

A practical method for checking built work against drawings: latest revision, a checklist from the drawings, counts and dimensions, records and follow-up.

14 November 2026 · 2 min read

Guides

How do you check what changed between drawing revisions?

How to spot what changed between drawing revisions: revision boxes, clouds, the drawing register, overlaying PDFs and comparing quantities.

14 November 2026 · 2 min read

Costs and pricing

How do subcontractors price a tender from drawings?

How specialist subcontractors price a tender: read the enquiry, find your scope, take off quantities, build rates, add prelims and risk, and list exclusions.

14 November 2026 · 2 min read

AI and software

How long does a take-off take?

How long a construction take-off takes by hand and with software, what makes it slower, and how to cut the time without losing accuracy.

14 November 2026 · 2 min read

Costs and pricing

How do housing associations measure planned works?

How housing association asset teams measure planned works such as windows, roofs and insulation: house types, drawings, sample surveys and multiplying up.

14 November 2026 · 2 min read

Measure your next drawing in minutes

Upload a PDF, pick your trade, and get an editable take-off with the scale used and a check-on-site list.

Try it free – 1 drawing, up to 3 pagesSee pricing
Blog: Take-Offs, Estimating & QS Questions Answered | QuantRead