Short answer: Most asset teams group homes into house types, measure each type once from drawings or a sample survey, then multiply by the number of homes in the programme. Stock condition data decides which homes need the work and when. A sample of homes is surveyed on site before ordering, because alterations mean not every home matches its drawing.

Start from the stock data

Stock condition surveys and the asset database show the age and condition of components such as windows, roofs, kitchens and boilers. They decide which homes are in each year’s programme.

Group by house type

Homes built together usually share a handful of house types. Measuring each type once, from the original drawings or a measured survey, is far quicker than measuring every home.

ProgrammeMeasured per house typeUnit
Window replacementOpenings and sizesnr
Re-roofingRoof area, ridge, hips, valleysm² / m
External wall insulationNet wall area less openingsm²
KitchensWorktop and wall tilingm / m²

Multiply up, then sample

Multiply each type by the number of homes, then survey a sample on site. Extensions, porches and earlier replacements change the quantities. See the example on take-off for housing associations.

Check contractor quotes

An independent measure of each house type makes it easy to check the quantities in contractor quotes and schedules of rates.

Tags: housing associations, planned maintenance, asset management

Let QuantRead do the measuring

Upload a PDF, pick your trade, and get an editable take-off with the scale used and a check-on-site list.

Try it free – 1 drawing, up to 3 pagesSee pricing

Related posts

All posts · FAQ · Take-off by trade

How do housing associations measure planned works? | QuantRead