For Site inspectors for the client
Drawing quantities for clerks of works
A clerk of works checks that what is built matches the drawings and specification. Knowing the drawn quantities before you walk the site makes it easier to plan what to look at and to track progress against a total.
Try it free – 1 drawing, up to 3 pagesSee pricing
Before the site walk
- Count what should be there on each floor: doors, windows, sanitaryware, light fittings, socket outlets.
- Get the drawn lengths of runs you will check, such as cavity barriers, fire-stopping joints or drainage.
- Note any assumptions or unclear sheets QuantRead flags. They are often the same places site will have questions.
During and after
Mark progress against the drawn totals and keep the measured list with your reports. When the design changes, re-run the revised drawing to see what changed.
Scope
QuantRead does not inspect work, confirm workmanship or judge whether something complies. It is a fast way to read numbers off drawings, so your time on site goes on the inspection itself.
Questions
- Can I use it on site?
- Yes, it runs in the phone or tablet browser, though upload the drawings before you go if signal is poor.
- Does it replace my inspection reports?
- No. It gives you the drawn quantities to check against.
Measure your next drawing in minutes
Upload a PDF, pick your trade, and get an editable take-off with the scale used and a check-on-site list.