How do you check construction work against the drawings?
1. Use the right drawings
Check the revision of every sheet against the drawing register. Inspecting against a superseded drawing causes more arguments than almost anything else.
2. Build a checklist from the drawings
List what should be there in each area: doors by type, windows, fire-stopping, services penetrations, fittings. Counts and lengths from the drawings give you a total to check against. QuantRead can pull these from the PDFs quickly.
3. Check on site, area by area
- Count and tick off items against the drawing.
- Check key dimensions, such as opening sizes and heights.
- Check products against the specification, not just the drawing.
- Photograph anything that differs, with its location.
4. Record and follow up
Log every difference with the drawing reference, location and photo, and send it through the contract route, usually to the contract administrator or the contractor’s site manager. Re-check once fixed.
What drawings cannot tell you
Drawings will not show whether work is installed to the manufacturer’s instructions, or whether hidden layers are right. That needs inspection during the work, test certificates and the right competent people.