How do you check construction work against the drawings?

Short answer: Make sure you have the latest revision, turn the drawings into a checklist of what should be there (counts, dimensions, products), check on site area by area, record what matches and what does not with photos, and follow up the differences through the proper channel. The drawings tell you what was intended; only the site visit tells you what was built.

1. Use the right drawings

Check the revision of every sheet against the drawing register. Inspecting against a superseded drawing causes more arguments than almost anything else.

2. Build a checklist from the drawings

List what should be there in each area: doors by type, windows, fire-stopping, services penetrations, fittings. Counts and lengths from the drawings give you a total to check against. QuantRead can pull these from the PDFs quickly.

3. Check on site, area by area

  • Count and tick off items against the drawing.
  • Check key dimensions, such as opening sizes and heights.
  • Check products against the specification, not just the drawing.
  • Photograph anything that differs, with its location.

4. Record and follow up

Log every difference with the drawing reference, location and photo, and send it through the contract route, usually to the contract administrator or the contractor’s site manager. Re-check once fixed.

What drawings cannot tell you

Drawings will not show whether work is installed to the manufacturer’s instructions, or whether hidden layers are right. That needs inspection during the work, test certificates and the right competent people.

Tags: quality, QA, inspection

Let QuantRead do the measuring

Upload a PDF, pick your trade, and get an editable take-off with the scale used and a check-on-site list.

Try it free – 1 drawing, up to 3 pagesSee pricing

Related posts

All posts · FAQ · Take-off by trade

How do you check construction work against the drawings? | QuantRead