Costs and pricing

How do you price a job from architect’s drawings?

Short answer: Read the whole drawing set and specification, take off the quantities for your scope, apply your material and labour rates to each line, add preliminaries, waste and risk, then your margin. Finish with clear inclusions, exclusions and assumptions so the client knows what the price covers.

1. Read the set before you measure

Go through plans, elevations, sections, details and the specification. Note what is in your scope, what is missing, and which drawings are marked “preliminary” or “not for construction”. Questions now save disputes later.

2. Take off the quantities

Measure your items in m, m² and nr. Follow How do I do a take-off from PDF drawings? or let QuantRead do a first pass.

3. Build your rates

  • Materials: supplier prices, plus delivery and your waste allowance.
  • Labour: your own output rates (for example m² per day) times your day cost.
  • Plant and access: scaffold towers, MEWPs, skips.

4. Add preliminaries and risk

Site set-up, travel, parking, welfare, supervision, and anything uncertain on the drawings. Price risk visibly rather than hiding it in the rates.

5. Margin and the quote itself

Add overheads and profit, then write a quote that lists the drawings and revisions you priced from, what is included and excluded, and any assumptions, such as ceiling heights you had to assume.

Reading drawings with confidence

If a drawing has no scale or no dimensions where you need them, ask the architect before guessing. A quantity that says “assumed” is far better than one that silently guesses.

Tags: pricing, estimating, drawings

Let QuantRead do the measuring

Upload a PDF, pick your trade, and get an editable take-off with the scale used and a check-on-site list.

Try it free – 1 drawing, up to 3 pagesSee pricing

Related posts

All posts · FAQ · Take-off by trade

How do you price a job from architect’s drawings? | QuantRead