Guides

What is a quantity take-off in construction?

Short answer: A quantity take-off is the list of measured quantities taken off the drawings for a job: lengths in metres, areas in square metres, volumes in cubic metres and counts in numbers. It is the first step of any estimate, bill of quantities or material order.

What a take-off includes

  • Item: what is measured, such as “stud partition type A”.
  • Quantity and unit: 46.0 m, 119.6 m², 24 nr.
  • Where it came from: drawing number and revision.
  • How it was got: from a written dimension, scaled, counted or assumed.

Take-off vs estimate

A take-off is quantities only. An estimate puts rates against those quantities to reach a price. Keeping them separate means you can re-price quickly when rates change, or re-measure quickly when the drawings change.

Material take-off

A material take-off (MTO) goes one step further and converts quantities into materials: boards, bricks, cartridges, tiles. Our trade guides show how, for example plasterboard and sealant.

Manual, digital and AI take-off

Take-offs used to be done with a scale rule on paper. Most are now done on screen with PDF measuring tools, and AI tools such as QuantRead can now do the first pass automatically.

Tags: take-off, definitions

Let QuantRead do the measuring

Upload a PDF, pick your trade, and get an editable take-off with the scale used and a check-on-site list.

Try it free – 1 drawing, up to 3 pagesSee pricing

Related posts

All posts · FAQ · Take-off by trade

What is a quantity take-off in construction? | QuantRead